Construction of the 2 new rooms~! [gaming+otaku] Part 2
Last time I posted the bare garage and some framing, not plastered, nothing :o This time, plaster + walls + doors! Oh and of course, lighting ^^
The painters are coming tomorrow to finish that off, and on Monday. The electricians I think are finishing tomorrow aswell, and then come back next week after the carpets in for the heaters to be hardwired in.
All my furniture has arrived, looking forward to 30+ flatpacks to make up @_@!
Also been stuffing christmas presents away too >.> Got right into Skylanders for Xbox (+ omg figures!). Loads of anime figures + anime to watch :D
Next Wednesday, the carpet goes in! And it'll finally be ready for moving in the furniture and entertainment stuff!
![Construction of the 2 new rooms~! [gaming+otaku] Part 2 Construction of the 2 new rooms~! [gaming+otaku] Part 2](http://www.figure.fm/cgm/ecommerce/figure/images/large/f2fc714a10c12fbbdbc2463545c812d2.jpg?1318515613)
![Construction of the 2 new rooms~! [gaming+otaku] Part 2 Construction of the 2 new rooms~! [gaming+otaku] Part 2](http://www.figure.fm/cgm/ecommerce/figure/images/large/a39abcce5808835b3607653a152a9f16.jpg?1318515618)
![Construction of the 2 new rooms~! [gaming+otaku] Part 2 Construction of the 2 new rooms~! [gaming+otaku] Part 2](http://www.figure.fm/cgm/ecommerce/figure/images/large/692a16e226d6e92e08f5f5b4c617345b.jpg?1318515623)
![Construction of the 2 new rooms~! [gaming+otaku] Part 2 Construction of the 2 new rooms~! [gaming+otaku] Part 2](http://www.figure.fm/cgm/ecommerce/figure/images/large/4c049b9d78b15e87ca8dfcf8518ec343.jpg?1318515627)
![Construction of the 2 new rooms~! [gaming+otaku] Part 2 Construction of the 2 new rooms~! [gaming+otaku] Part 2](http://www.figure.fm/cgm/ecommerce/figure/images/large/851a7ca54d91dc91fc15ebde0e595994.jpg?1318515630)
![Construction of the 2 new rooms~! [gaming+otaku] Part 2 Construction of the 2 new rooms~! [gaming+otaku] Part 2](http://www.figure.fm/cgm/ecommerce/figure/images/large/2c2ace10290ed39d4a224135c3db5e29.jpg?1318515634)
![Construction of the 2 new rooms~! [gaming+otaku] Part 2 Construction of the 2 new rooms~! [gaming+otaku] Part 2](http://www.figure.fm/cgm/ecommerce/figure/images/large/da7a8124e8667489c2fbf729f8172a22.jpg?1318515640)











I bet that look is going to look awesome when its done
Def :D I got a new pic of the next bit over at myfigurecollection :D I can move my stuff in this Wednesday ^^
http://myfigurecollection.net/picture/294184
I'm looking forward to your next post. room looks awesome XD
http://myfigurecollection.net/picture/294184
That's the next pic so far :) I'll make a new post soon on here aswell :) Finally I can move my furniture and figures in on Wednesday!
That's a high door knob...
You will want one if you got younger visitors to stay away from your H-rated materials :P
There's not going to be any young children around, so alls good :D And no H-rated stuff xD
LoL well only 2 things came to mind, either they are really tall or the ceiling is very low... XD
Its a little lower then the usual high ceilings, because its the double garage (that's under the top floor of the house, 2nd floor) getting converted. Its not into the ground or anything like that, just a double garage :)
Its 1100mm off the ground, not really that high :) We have higher ones upstairs, as that's the style they did when they built the house :)
lol sad that i had look up how high 1100mm was since i live in american i don't use mm all that often and forget how far that is XD
Hehe ^^ 1m and 10cms - Or 110cms, or 43.30 inches - if that helps others aswell :D
oh i found out before i posted that, i just thought it was sad that i had to look it up since i wasn't sure lol.